Testimonials

“This letter is written to express our complete satisfaction with the services provided by Preferred Tank & Tower. The services of this company were provided in a professional manner within predetermined time constraints, for a very reasonable fee. The principals of Preferred Tank & Tower provided an array of alternatives and proposals from which to choose throughout the development process which made the resulting product customized to our particular needs.”
- Rickie Rainbolt, The Goodyear Tire & Rubber Company.

“In July, one of your crews finished major repairs and painting of our fire protection water tower. They also made several modifications that were needed to bring our tower into current OSHA compliance and to change the logo from Kulman to ABB. Thanks for a job well done.”
- Ken Rawson, ABB.

“I am writing to say what a pleasure it has been to do business with Preferred Tank. The painting of our water tank/cell site was the easiest project we have done with an outside vendor in years. Your crew did an excellent job power washing and painting the tank. Everyone was kept informed and worked well together. The tank looks fantastic and everyone from the municipality to the cell carriers are happy. Thank you for the excellent job.”
- Harry A. Terbush, Windsor Machinery Company.

“Preferred Tank and Tower provided the design, fabrication and installation of twin 300,000 gallon tanks for the Ethicon Potable Water Facility project in Cornelia, Georgia for which Optum Construction Group was the Design-Build Contractor. We found Preferred Tank and Tower to exhibit professionalism throughout the project. They were diligent in addressing any issues that arose, aggressive in meeting the project schedule and provided a quality product and service. We would recommend Preferred Tank and Tower and look forward to working with them in the future.”
- Ed Maxwell, Optum Construction Group.

“I wanted to let you guys know how pleased we were not only the work done but the manner in which the entire crew conducted themselves. We had a very tight timeline and even discovered some issues that needed to be fixed that we had not previously been aware of. Your crew worked safely and efficiently to complete the work ahead of schedule. We put safety first in everything that we do at PPI and it is nice to see a contractor crew that does the same thing. The tower looks great and we have had no issues… Thank you from all of us at PPI for a job well done.”
- Brian Wommack, Power Partners, Inc.

“The repairs on our water storage tank completed by Preferred Tank & Tower went very well. The contractors arrived on time and preformed all work in a very professional manner. They constantly kept us informed of progress and work was completed ahead of our expectations and we were able to refill the tanks and get our fire suppression system fully operational again. We look forward to working with Preferred Tank & Tower for any future needs.”
- Shawn Butler, MeadWestvaco.

“Preferred Tank and Tower provided us with an excellent underwater tank inspection using robotic and video technology. The reports submitted were very professionally done and make a good addition to our Preventative Maintenance Library. It consisted of individually bound reports for each of our three tanks inspected along with a CD recording. The quality of pictures was excellent and provided us with necessary information to make decisions on draining the vessels to inspect. I would recommend this service and we do plan to utilize the service in the future.”
- Jared Stewart, Kimberly-Clark Corporation.

“Preferred Tank & Tower recently completed dismantling our 100,000 gallon elevated water tank. They performed the operation in a professional and workmanlike manner. Plans were communicated and carried out safely and effectively and the work was performed in a timely manner.“
- Jerry “Gordon” Garcie, City of Shreveport, LA.

“I would like to commend Preferred Tank & Tower on the fabrication and delivery of the fire water storage tank for our project at LRW-83 Boarder Check Point. Preferred Tank & Tower’s timely fabrication and shipping of this 7,000 gallon tank to the project site went without a hitch. No need to tell you, that this makes Allied Fire Protection look good and in turn your company looks good. I personally would like to extend my appreciation and thanks to your firm for a successful project and look forward to working together in the future. Our customer could not be more pleased with the tank provided by your firm.”
- Michael J. Blake, Allied Fire Protection.

“Preferred Tank and Tower repaired and painted two water storage towers. I can say that the crew on site here performed their job in a competent and professional manner. The job was done in a timely manner and safety rules were adhered to. Overall, I have been satisfied with the repair crew’s performance in all phases of the project.”
- Boyd Pharis, Alcoa.